Preparation Instructions
Please complete these tasks before we arrive to refinish your tub or shower: Remove all items from tub and shower (soap, brushes, wash cloths, etc.) Remove all personal items from counter Remove rugs and towels from bathroom If possible, please complete the following tasks before we arrive to refinish your tub or shower: Remove shower doors (if possible) Remove calking around tub/shower (if possible) Remove bathtub drain (if possible) If you are remodeling your bathroom: New flooring should be installed and left uncaulked to the tub or shower If you have installed a new surround, it should be installed tight to the tub but leave it uncaulked All bathroom painting should be completed before we refinish your tub Repair any drips or leaks in tub faucet or shower All plumbing repairs must be completed If you're installing a new drain, use plumbers putty only If toilet or vanity sits within 18 inches to the item being refinished, please remove it All lighting and electrical work completed Do not install any shower doors for at least 5 days after refinishing