Preparation Instructions
Please complete these tasks before we arrive to refinish your tub or shower:
- Remove all items from tub and shower (shower curtain, soap, brushes, wash cloths, etc.)
- Remove all personal items from counter
- Remove rugs and towels from bathroom
If possible, please complete the following tasks before we arrive to refinish your tub or shower:
- Remove shower doors (if possible)
- Remove bathtub drain (if possible)
- If the toilet is close to the bathtub, please measure the distance between the toilet and tub, and provide us that measurement
If you are remodeling your bathroom:
- New flooring should be installed and left uncaulked to the tub or shower
- If you have installed a new surround, it should be installed tight to the tub but leave it uncaulked
- All bathroom painting should be completed before we refinish your tub
- Repair any drips or leaks in tub faucet or shower
- All plumbing repairs must be completed
- If you’re installing a new drain, use plumbers’ putty only – no silicone
- If toilet or vanity sits within 12 inches to the item being refinished, please remove it if possible
- All lighting and electrical work completed
- Do not install any shower doors for at least 5 days after refinishing



Leave A Comment