Preparation Instructions

Please complete these tasks before we arrive to refinish your tub or shower:

  • Remove all items from tub and shower (shower curtain, soap, brushes, wash cloths, etc.)
  • Remove all personal items from counter
  • Remove rugs and towels from bathroom

If possible, please complete the following tasks before we arrive to refinish your tub or shower:

  • Remove shower doors (if possible)
  • Remove bathtub drain (if possible)​
  • If the toilet is close to the bathtub, please measure the distance between the toilet and tub, and provide us that measurement

If you are remodeling your bathroom:

  • New flooring should be installed and left uncaulked to the tub or shower
  • If you have installed a new surround, it should be installed tight to the tub but leave it uncaulked
  • All bathroom painting should be completed before we refinish your tub
  • Repair any drips or leaks in tub faucet or shower
  • All plumbing repairs must be completed
  • If you’re installing a new drain, use plumbers’ putty only – no silicone
  • If toilet or vanity sits within 12 inches to the item being refinished, please remove it if possible
  • All lighting and electrical work completed
  • Do not install any shower doors for at least 5 days after refinishing